Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
617
matching recommendationsSIC | 3561 | Pumps And Pumping Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0548 # 06 Y:2023 | 06 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $299 | $1,500 | Not Implemented |
LE0548 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,216 | $2,500 | Not Implemented |
LE0548 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,456 | $100 | Implemented |
LE0548 # 05 Y:2023 | 05 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,649 | $17,000 | Not Implemented |
LE0548 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,252 | $2,480 | Implemented |
LE0548 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $5,982 | $1,900 | Implemented |
LE0548 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,121 | $45,050 | Implemented |
UF0577 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,354 | $640 | Implemented |
UF0577 # 11 Y:2022 | 11 | 2022 | RECOVER AND REUSE WASTE MATERIAL | $28,657 | $31,000 | Implemented |
UF0577 # 10 Y:2022 | 10 | 2022 | SCHEDULE DELIVERIES ACCORDING TO DEMAND | $3,120 | $2,528 | Implemented |
UF0577 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,407 | $2,618 | Implemented |
UF0577 # 07 Y:2022 | 07 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,440 | $3,987 | Not Implemented |
UF0577 # 09 Y:2022 | 09 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,049 | $200 | Implemented |
UF0577 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $1,187 | $4,373 | Not Implemented |
UF0577 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,991 | $304 | Implemented |
UF0577 # 03 Y:2022 | 03 | 2022 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,363 | $0 | Implemented |
UF0577 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,972 | $0 | Implemented |
UF0577 # 04 Y:2022 | 04 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,190 | $15,730 | Not Implemented |
GT0957 # 02 Y:2021 | 02 | 2021 | AIR CONDITION ONLY SPACE NECESSARY | $4,101 | $200 | Implemented |
GT0957 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $53,036 | $38,422 | Implemented |
GT0957 # 08 Y:2021 | 08 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,031 | $737,508 | Not Implemented |
GT0957 # 07 Y:2021 | 07 | 2021 | INSULATE BARE EQUIPMENT | $1,020 | $813 | Not Implemented |
GT0957 # 05 Y:2021 | 05 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $3,211 | $1,067 | Implemented |
GT0957 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,872 | $1,050 | Implemented |
GT0957 # 04 Y:2021 | 04 | 2021 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,152 | $250 | Not Implemented |