IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

617

matching recommendations
Reset
SIC 3561 Pumps And Pumping Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0548 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $299 $1,500 Not Implemented
LE0548 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,216 $2,500 Not Implemented
LE0548 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,456 $100 Implemented
LE0548 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,649 $17,000 Not Implemented
LE0548 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,252 $2,480 Implemented
LE0548 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $5,982 $1,900 Implemented
LE0548 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,121 $45,050 Implemented
UF0577 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,354 $640 Implemented
UF0577 # 11 Y:2022 11 2022 RECOVER AND REUSE WASTE MATERIAL $28,657 $31,000 Implemented
UF0577 # 10 Y:2022 10 2022 SCHEDULE DELIVERIES ACCORDING TO DEMAND $3,120 $2,528 Implemented
UF0577 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,407 $2,618 Implemented
UF0577 # 07 Y:2022 07 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,440 $3,987 Not Implemented
UF0577 # 09 Y:2022 09 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,049 $200 Implemented
UF0577 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,187 $4,373 Not Implemented
UF0577 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,991 $304 Implemented
UF0577 # 03 Y:2022 03 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,363 $0 Implemented
UF0577 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,972 $0 Implemented
UF0577 # 04 Y:2022 04 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,190 $15,730 Not Implemented
GT0957 # 02 Y:2021 02 2021 AIR CONDITION ONLY SPACE NECESSARY $4,101 $200 Implemented
GT0957 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,036 $38,422 Implemented
GT0957 # 08 Y:2021 08 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $78,031 $737,508 Not Implemented
GT0957 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $1,020 $813 Not Implemented
GT0957 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $3,211 $1,067 Implemented
GT0957 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,872 $1,050 Implemented
GT0957 # 04 Y:2021 04 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,152 $250 Not Implemented