Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

617

matching recommendations
Reset
SIC 3561 Pumps And Pumping Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0553 # 06 Y:2004 06 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,620 $15,230 Not Implemented
CO0553 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $360 $520 Not Implemented
WI0477 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,743 $0 Not Implemented
WI0477 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,524 $855 Not Implemented
WI0477 # 03 Y:2004 03 2004 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,765 $605 Not Implemented
WI0477 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,817 $433 Not Implemented
WI0477 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $923 $0 Not Implemented
WI0477 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $0 Implemented
WI0477 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $582 $0 Not Implemented
LL0168 # 01 Y:2003 01 2003 USE PHOTOCELL CONTROLS $8,239 $1,196 Not Implemented
LL0168 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,916 $900 Not Implemented
LL0168 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,845 $4,800 Implemented
LL0168 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $5,699 $280 Not Implemented
LL0168 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $1,257 $1,784 Not Implemented
LL0168 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $981 $20 Not Implemented
LL0168 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $240 Implemented
LL0168 # 08 Y:2003 08 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,146 $1,157 Implemented
UU0037 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,120 $0 Not Implemented
UU0037 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $675 $420 Not Implemented
UU0037 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $1,896 $2,861 Not Implemented
UU0037 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,174 $20 Not Implemented
UU0037 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,586 $230 Not Implemented
CO0506 # 01 Y:2002 01 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,510 $12,000 Not Implemented
CO0506 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,150 $540 Not Implemented
CO0506 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $432 $240 Not Implemented