IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 3561 Pumps And Pumping Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0168 # 08 Y:2003 08 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,146 $1,157 Implemented
LL0168 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $240 Implemented
LL0168 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $981 $20 Not Implemented
LL0168 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $1,257 $1,784 Not Implemented
LL0168 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $5,699 $280 Not Implemented
LL0168 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,845 $4,800 Implemented
LL0168 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,916 $900 Not Implemented
LL0168 # 01 Y:2003 01 2003 USE PHOTOCELL CONTROLS $8,239 $1,196 Not Implemented
AR0138 # 07 Y:1998 07 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,107 $8,000 Not Implemented
AR0138 # 10 Y:1998 10 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $951 $2,000 Not Implemented
AR0138 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,411 $1,595 Implemented
AR0138 # 08 Y:1998 08 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,864 $5,900 Not Implemented
AR0138 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $1,276 $182 Implemented
AR0138 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $6,014 $998 Not Implemented
AR0138 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $367 $615 Implemented
AR0138 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $465 $120 Implemented
AR0138 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $798 $110 Not Implemented
AR0138 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,160 $120 Implemented
AR0012 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,665 $1,170 Implemented
AR0012 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $1,684 $330 Not Implemented
AR0012 # 05 Y:1993 05 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $23,430 $23,250 Not Implemented
AR0012 # 04 Y:1993 04 1993 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS $1,373 $100 Not Implemented
AR0012 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $949 $720 Implemented
AR0012 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,387 $400 Implemented