IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 3561 Pumps And Pumping Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0974 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $12,407 $15,373 Not Implemented
OK0974 # 09 Y:2017 09 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,589 $11,640 Not Implemented
OK0974 # 08 Y:2017 08 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $309 $191 Not Implemented
OK0974 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $414 $0 Not Implemented
OK0974 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $691 Not Implemented
OK0974 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,726 $0 Not Implemented
OK0974 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,524 $11,407 Not Implemented
OK0974 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,588 $7,868 Not Implemented
OK0974 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,219 $12,710 Not Implemented
KU0342 # 01 Y:1991 01 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,017 $3,600 Not Implemented
KU0342 # 08 Y:1991 08 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $325 $0 Not Implemented
KU0342 # 07 Y:1991 07 1991 REDUCE VENTILATION AIR $1,195 $200 Not Implemented
KU0342 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $2,678 $550 Not Implemented
KU0342 # 05 Y:1991 05 1991 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $4,942 $100,000 Not Implemented
KU0342 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,753 $500 Not Implemented
KU0342 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $774 $1,140 Not Implemented
KU0342 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $8,091 $9,690 Not Implemented