Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 3561 | Pumps And Pumping Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0985 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,113 | $0 | Implemented |
UD0985 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,260 | $1,000 | Implemented |
UD0985 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $957 | $2,500 | Implemented |
UD0985 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $938 | $0 | Not Implemented |
UD0985 # 05 Y:2018 | 05 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $320 | $1,500 | Not Implemented |
UD0985 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,998 | $55,816 | Implemented |
UD0985 # 07 Y:2018 | 07 | 2018 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $30,420 | $25,000 | Implemented |
UD0922 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,813 | $1,000 | Not Implemented |
UD0922 # 05 Y:2015 | 05 | 2015 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $33,724 | $600 | Not Implemented |
UD0922 # 04 Y:2015 | 04 | 2015 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $103,649 | $29,400 | Not Implemented |
UD0922 # 03 Y:2015 | 03 | 2015 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $122 | $140 | Not Implemented |
UD0922 # 02 Y:2015 | 02 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,063 | $4,947 | Not Implemented |
UD0922 # 01 Y:2015 | 01 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $31,816 | $0 | Not Implemented |
UD0922 # 10 Y:2015 | 10 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $39,230 | $67,300 | Not Implemented |
UD0922 # 11 Y:2015 | 11 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,020 | $0 | Not Implemented |
UD0922 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $61,348 | $65,000 | Not Implemented |
UD0922 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,367 | $0 | Not Implemented |
UD0922 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,944 | $1,500 | Not Implemented |
UD0418 # 01 Y:1993 | 01 | 1993 | PAY UTILITY BILLS ON TIME | $2,115 | $0 | Not Implemented |
UD0418 # 02 Y:1993 | 02 | 1993 | OPTIMIZE PLANT POWER FACTOR | $14,702 | $9,250 | Implemented |
UD0418 # 03 Y:1993 | 03 | 1993 | INSTALL EFFICIENT RECTIFIERS | $1,456 | $15,000 | Implemented |
UD0418 # 04 Y:1993 | 04 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,180 | $4,000 | Implemented |
UD0418 # 05 Y:1993 | 05 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,259 | $6,000 | Implemented |
UD0418 # 06 Y:1993 | 06 | 1993 | RECOVER AND REUSE COOLING WATER | $12,300 | $1,000 | Implemented |
UD0353 # 06 Y:1991 | 06 | 1991 | INSTALL STORM WINDOWS AND DOORS | $877 | $1,080 | Not Implemented |