Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
676
matching recommendationsSIC | 3564 | Blowers And Fans |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0095 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,615 | $0 | Not Implemented |
TA0095 # 06 Y:2005 | 06 | 2005 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $270 | $0 | Not Implemented |
TA0095 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,370 | $0 | Not Implemented |
TA0095 # 08 Y:2005 | 08 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $430 | $0 | Not Implemented |
UD0674 # 01 Y:2003 | 01 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,633 | $45,760 | Not Implemented |
UD0674 # 02 Y:2003 | 02 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $8,166 | $30,000 | Implemented |
UD0674 # 03 Y:2003 | 03 | 2003 | MODIFY STARTUP/SHUTDOWN TIMES | $2,311 | $0 | Not Implemented |
UD0674 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $1,353 | $2,168 | Not Implemented |
UD0674 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,100 | $3,078 | Not Implemented |
UD0674 # 06 Y:2003 | 06 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $753 | $1,048 | Not Implemented |
UD0674 # 07 Y:2003 | 07 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $715 | $0 | Implemented |
UD0674 # 08 Y:2003 | 08 | 2003 | ADD AREA LIGHTING SWITCHES | $687 | $500 | Not Implemented |
UD0674 # 09 Y:2003 | 09 | 2003 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $623 | $604 | Not Implemented |
UD0674 # 10 Y:2003 | 10 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $554 | $2,200 | Implemented |
UD0674 # 11 Y:2003 | 11 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $509 | $142 | Not Implemented |
UD0674 # 12 Y:2003 | 12 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $481 | $0 | Implemented |
UD0674 # 13 Y:2003 | 13 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $475 | $350 | Not Implemented |
UD0674 # 14 Y:2003 | 14 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $360 | $100 | Implemented |
UD0674 # 15 Y:2003 | 15 | 2003 | DISCONNECT BALLASTS | $313 | $44 | Implemented |
NC0237 # 01 Y:2002 | 01 | 2002 | RECYCLE WHITE WATER | $6,970 | $3,500 | Implemented |
NC0237 # 02 Y:2002 | 02 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,443 | $680 | Implemented |
NC0237 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,935 | $3,000 | Not Implemented |
NC0237 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,825 | $500 | Not Implemented |
WI0395 # 06 Y:2001 | 06 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,627 | $500 | Not Implemented |
WI0395 # 05 Y:2001 | 05 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,257 | $6,000 | Implemented |