IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

676

matching recommendations
Reset
SIC 3564 Blowers And Fans
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0163 # 08 Y:1999 08 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,619 $3,500 Not Implemented
WV0163 # 11 Y:1999 11 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $22,950 $0 Implemented
WV0163 # 10 Y:1999 10 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $49,719 $11,000 Implemented
WV0163 # 09 Y:1999 09 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $1,854 $1,075 Implemented
WV0163 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,038 $30 Not Implemented
WV0163 # 07 Y:1999 07 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $740 $420 Not Implemented
UD0559 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $18,360 $25,000 Not Implemented
UD0559 # 02 Y:1998 02 1998 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $13,770 $5,000 Implemented
UD0559 # 03 Y:1998 03 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,474 $0 Not Implemented
UD0559 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,779 $454 Not Implemented
UD0559 # 05 Y:1998 05 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,469 $0 Implemented
UD0559 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,782 $500 Implemented
UD0559 # 07 Y:1998 07 1998 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,752 $2,000 Not Implemented
UD0559 # 08 Y:1998 08 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,492 $1,060 Not Implemented
UD0559 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,288 $0 Implemented
OK0554 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,306 $13,340 Not Implemented
OK0554 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $571 $2,830 Implemented
OK0554 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $12,689 $4,620 Not Implemented
OK0554 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $544 Not Implemented
OK0554 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,170 $97,980 Not Implemented
OK0554 # 06 Y:1998 06 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $812 $0 Implemented
OK0554 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $3,600 $0 Implemented
OK0554 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $210,600 $120,000 Not Implemented
OK0554 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,653 $3,170 Implemented
UL0197 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $8,627 $8,912 Not Implemented