IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3564 Blowers And Fans
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0204 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $503 $40 Implemented
WV0204 # 15 Y:2000 15 2000 $72,800 $140,000 Not Implemented
WV0204 # 14 Y:2000 14 2000 $20,000 $500 Not Implemented
WV0204 # 13 Y:2000 13 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,081 $5,000 Not Implemented
WV0204 # 12 Y:2000 12 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,902 $5,604 Not Implemented
WV0204 # 11 Y:2000 11 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,992 $34 Not Implemented
WV0204 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $705 $75 Implemented
WV0204 # 09 Y:2000 09 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,607 $680 Implemented
WV0204 # 08 Y:2000 08 2000 ISOLATE HOT OR COLD EQUIPMENT $996 $1,500 Not Implemented
WV0204 # 07 Y:2000 07 2000 USE SYNTHETIC LUBRICANT $656 $334 Implemented
WV0204 # 06 Y:2000 06 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,627 $680 Implemented
WV0204 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $12,395 $2,180 Implemented
WV0204 # 04 Y:2000 04 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $658 $1,088 Implemented
WV0204 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,068 $17 Implemented
WV0204 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,706 $268 Not Implemented
WV0163 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,038 $30 Not Implemented
WV0163 # 11 Y:1999 11 1999 $22,950 $0 Implemented
WV0163 # 10 Y:1999 10 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $49,719 $11,000 Implemented
WV0163 # 09 Y:1999 09 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $1,854 $1,075 Implemented
WV0163 # 08 Y:1999 08 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,619 $3,500 Not Implemented
WV0163 # 07 Y:1999 07 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $740 $420 Not Implemented
WV0163 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $947 $616 Not Implemented
WV0163 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $3,844 $390 Implemented
WV0163 # 04 Y:1999 04 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $4,974 $6,400 Not Implemented
WV0163 # 03 Y:1999 03 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,997 $1,290 Implemented