IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
SIC 3567 Industrial Furnaces And Ovens
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0427 # 02 Y:2002 02 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,439 $400 Implemented
WI0427 # 03 Y:2002 03 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,046 $1,000 Not Implemented
WI0427 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,091 $3,136 Not Implemented
WI0427 # 05 Y:2002 05 2002 REDUCE VENTILATION AIR $522 $500 Not Implemented
WI0427 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $391 $740 Implemented
WI0427 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $120 $0 Not Implemented
BD0210 # 01 Y:2002 01 2002 USE RADIANT HEATER FOR SPOT HEATING $4,813 $9,000 Implemented
BD0210 # 02 Y:2002 02 2002 ADD AREA LIGHTING SWITCHES $3,792 $2,700 Implemented
BD0210 # 03 Y:2002 03 2002 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $3,594 $3,500 Implemented
BD0210 # 04 Y:2002 04 2002 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $703 $2,500 Not Implemented
BD0210 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $516 $750 Implemented
BD0210 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $439 $1,200 Implemented
BD0210 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $422 $500 Implemented
BD0210 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-124 $281 Implemented
BD0210 # 09 Y:2002 09 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $406 $1,200 Implemented
BD0210 # 10 Y:2002 10 2002 MODIFY STARTUP/SHUTDOWN TIMES $26,800 $5,000 Not Implemented
WV0127 # 10 Y:1997 10 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $85,710 $80,000 Not Implemented
WV0127 # 09 Y:1997 09 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,040 $200 Not Implemented
WV0127 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $718 $807 Implemented
WV0127 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,628 $4,080 Implemented
WV0127 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $243 $480 Implemented
WV0127 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $391 $200 Implemented
WV0127 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,192 $0 Not Implemented
WV0127 # 05 Y:1997 05 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $19,644 $12,500 Not Implemented
WV0127 # 08 Y:1997 08 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $538 $188 Not Implemented