IAC Assessment: BD0210
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0210
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2002
Principal Product Electrical Safety Switches
NAICS n/a
SIC 3567 - Industrial Furnaces And Ovens
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 56,000
Annual Production 36,500 Pieces
Production Hrs. Annual 4,160
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,237 2,453,640 kWh $0.03
Electricity Demand $61,335 6,333 kW-months/year $9.68
Natural Gas $83,909 12,363 MMBtu $6.79
TOTAL ENERGY COSTS $227,660
RECOMMENDED SAVINGS* $41,361 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,858
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,813
Cost:
$9,000
$4,813 198,623 - - - - - - - - $4,813
198,623
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$3,792
Cost:
$2,700
$1,628 51,667 $2,164 224 - - - - - - $1,628
51,667
kWh
$2,164
224
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$3,594
Cost:
$3,500
$3,594 148,329 - - - - - - - - $3,594
148,329
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$703
Cost:
$2,500
- - $645 67 $58 22,989 - - - - -
-
kWh
$645
67
kW-months/year
$58
22,989
MMBtu
-
-
Tgal
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$516
Cost:
$750
$202 6,423 $314 32 - - - - - - $202
6,423
kWh
$314
32
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$439
Cost:
$1,200
$232 7,367 $207 21 - - - - - - $232
7,367
kWh
$207
21
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$422
Cost:
$500
$224 7,098 $198 21 - - - - - - $224
7,098
kWh
$198
21
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$(-124)
Cost:
$281
$94 2,996 $40 4 - - - - $(-258) - $94
2,996
kWh
$40
4
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-258)
-
$
09: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$406
Cost:
$1,200
- - - - - - $406 475 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$406
475
Tgal
-
-
$
10: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$26,800
Cost:
$5,000
- - $26,800 3,800 - - - - - - -
-
kWh
$26,800
3,800
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$41,361
Cost:
$26,631
$10,787 422,503 $30,368 4,169 $58 22,989 $406 475 $(-258) - $10,787
422,503
kWh
$30,368
4,169
kW-months/year
$58
22,989
MMBtu
$406
475
Tgal
$(-258)
-
$
TOTAL IMPLEMENTED Savings:
$13,858
Cost:
$19,131
$10,787 422,503 $2,923 302 - - $406 475 $(-258) - $10,787
422,503
kWh
$2,923
302
kW-months/year
-
-
MMBtu
$406
475
Tgal
$(-258)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost