IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 3567 Industrial Furnaces And Ovens
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0422 # 09 Y:2013 09 2013 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $17,739 $4,600 Not Implemented
BD0422 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $530 $500 Not Implemented
BD0422 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $610 $1,000 Not Implemented
BD0422 # 06 Y:2013 06 2013 USE SYNTHETIC LUBRICANT $633 $300 Not Implemented
BD0422 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,187 $25 Not Implemented
BD0422 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $2,518 $3,225 Not Implemented
BD0422 # 03 Y:2013 03 2013 USE SYNTHETIC LUBRICANT $4,219 $4,219 Not Implemented
BD0422 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $11,658 $28,800 Not Implemented
BD0422 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,352 $400 Not Implemented
BD0210 # 10 Y:2002 10 2002 $26,800 $5,000 Not Implemented
BD0210 # 01 Y:2002 01 2002 USE RADIANT HEATER FOR SPOT HEATING $4,813 $9,000 Implemented
BD0210 # 09 Y:2002 09 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $406 $1,200 Implemented
BD0210 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-124 $281 Implemented
BD0210 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $422 $500 Implemented
BD0210 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $439 $1,200 Implemented
BD0210 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $516 $750 Implemented
BD0210 # 04 Y:2002 04 2002 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $703 $2,500 Not Implemented
BD0210 # 03 Y:2002 03 2002 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $3,594 $3,500 Implemented
BD0210 # 02 Y:2002 02 2002 ADD AREA LIGHTING SWITCHES $3,792 $2,700 Implemented