IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3567 Industrial Furnaces And Ovens
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0127 # 10 Y:1997 10 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $85,710 $80,000 Not Implemented
WV0127 # 09 Y:1997 09 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,040 $200 Not Implemented
WV0127 # 08 Y:1997 08 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $538 $188 Not Implemented
WV0127 # 07 Y:1997 07 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $96,588 $16,000 Not Implemented
WV0127 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,192 $0 Not Implemented
WV0127 # 05 Y:1997 05 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $19,644 $12,500 Not Implemented
WV0127 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $391 $200 Implemented
WV0127 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $243 $480 Implemented
WV0127 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,628 $4,080 Implemented
WV0127 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $718 $807 Implemented
KU0476 # 11 Y:1997 11 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $7,620 $0 Implemented
KU0476 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,340 $0 Implemented
KU0476 # 10 Y:1997 10 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,340 $300 Implemented
KU0476 # 09 Y:1997 09 1997 RECYCLE CASTING SAND $4,050 $0 Not Implemented
KU0476 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $180 $270 Implemented
KU0476 # 07 Y:1997 07 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $370 $810 Not Implemented
KU0476 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $780 Not Implemented
KU0476 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $780 $1,400 Not Implemented
KU0476 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,010 $230 Implemented
KU0476 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,360 $5,470 Implemented
KU0476 # 02 Y:1997 02 1997 USE RADIANT HEATER FOR SPOT HEATING $1,540 $5,580 Not Implemented