IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

286

matching recommendations
Reset
SIC 3568 Power Transmission Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0498 # 07 Y:2020 07 2020 USE PHOTOCELL CONTROLS $380 $615 Not Implemented
SU0498 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $325 $60 Not Implemented
SU0498 # 05 Y:2020 05 2020 DISCONNECT BALLASTS $81 $30 Not Implemented
SU0498 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $323 $427 Not Implemented
LE0486 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,256 $65,000 Not Implemented
LE0486 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,174 $1,540 Implemented
LE0486 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,726 $7,400 Not Implemented
LE0486 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $8,764 $720 Implemented
LE0486 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $57,024 $500 Not Implemented
LE0486 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,558 $28,275 Implemented
LE0486 # 04 Y:2019 04 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $15,202 $21,000 Not Implemented
UA0153 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,306 $65,413 Not Implemented
UA0153 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,300 $2,995 Not Implemented
UA0153 # 04 Y:2016 04 2016 USE PHOTOCELL CONTROLS $329 $118 Implemented
UA0153 # 01 Y:2016 01 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $73,794 $99,000 Not Implemented
UA0153 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,753 $100 Not Implemented
UA0153 # 02 Y:2016 02 2016 INSTALL TIMERS AND/OR THERMOSTATS $25,593 $4,000 Implemented
UA0153 # 08 Y:2016 08 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $537 $0 Implemented
UA0153 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,568 $5,780 Not Implemented
AM0686 # 09 Y:2015 09 2015 PAY UTILITY BILLS ON TIME $1,789 $0 Not Implemented
AM0686 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,915 $1,810 Not Implemented
AM0686 # 06 Y:2015 06 2015 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $12,685 $17,600 Not Implemented
AM0686 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $455 $220 Not Implemented
AM0686 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $5 Not Implemented
AM0686 # 02 Y:2015 02 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,790 $0 Not Implemented