Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 3568 | Power Transmission Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0757 # 09 Y:2007 | 09 | 2007 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,300 | $992 | Not Implemented |
UD0757 # 08 Y:2007 | 08 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,293 | $0 | Implemented |
UD0757 # 07 Y:2007 | 07 | 2007 | REDUCE VENTILATION AIR | $5,019 | $0 | Not Implemented |
UD0757 # 06 Y:2007 | 06 | 2007 | USE OPTIMUM THICKNESS INSULATION | $5,633 | $606 | Not Implemented |
UD0757 # 05 Y:2007 | 05 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,031 | $0 | Implemented |
UD0757 # 04 Y:2007 | 04 | 2007 | USE OPTIMUM TEMPERATURE | $8,681 | $0 | Not Implemented |
UD0757 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,547 | $1,600 | Implemented |
UD0757 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $32,124 | $0 | Implemented |
UD0757 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,618 | $48,190 | Not Implemented |
UM0248 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,550 | $1,000 | Not Implemented |
UM0248 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,890 | $225 | Implemented |
UM0248 # 03 Y:2004 | 03 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,420 | $920 | Not Implemented |
UM0248 # 02 Y:2004 | 02 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,467 | $2,000 | Implemented |
UM0248 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $18,156 | $2,400 | Not Implemented |
UD0642 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $338 | $800 | Not Implemented |
UD0642 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,047 | $400 | Implemented |
UD0642 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,027 | $1,450 | Implemented |
UD0642 # 04 Y:2002 | 04 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,364 | $7,000 | Implemented |
UD0642 # 03 Y:2002 | 03 | 2002 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,876 | $5,000 | Not Implemented |
UD0642 # 02 Y:2002 | 02 | 2002 | INSTALL SKYLIGHTS | $8,274 | $39,600 | Not Implemented |
UD0642 # 01 Y:2002 | 01 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $39,312 | $0 | Not Implemented |
UD0453 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,297 | $2,880 | Not Implemented |
UD0453 # 04 Y:1995 | 04 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $894 | $2,000 | Not Implemented |
UD0453 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $656 | $5,000 | Not Implemented |
UD0453 # 02 Y:1995 | 02 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,640 | $0 | Implemented |