IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

458

matching recommendations
Reset
SIC 3569 General Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0259 # 08 Y:1988 08 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $225 $150 Implemented
KU0259 # 09 Y:1988 09 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $149 $160 Not Implemented
KU0259 # 10 Y:1988 10 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $105 $0 Implemented
TN0347 # 01 Y:1988 01 1988 KEEP LAMPS AND REFLECTORS CLEAN $15,953 $64,009 Implemented
TN0347 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $5,095 $560 Not Implemented
TN0347 # 03 Y:1988 03 1988 INSTALL SET-BACK TIMERS $4,365 $0 Implemented
TN0347 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,122 $180 Implemented
TN0347 # 05 Y:1988 05 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,040 $1,750 Implemented
TN0347 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,926 $575 Implemented
OK0262 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $15,713 $3,089 Implemented
OK0262 # 02 Y:1988 02 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,723 $0 Not Implemented
OK0262 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $495 $0 Implemented
OK0262 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,786 $0 Implemented
OK0262 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $982 $840 Implemented
OK0262 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,610 $9,800 Not Implemented
MA0116 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,841 $320 Not Implemented
MA0116 # 02 Y:1988 02 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $435 $515 Not Implemented
MA0116 # 03 Y:1988 03 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,585 $0 Not Implemented
MA0116 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,632 $1,450 Not Implemented
MA0116 # 05 Y:1988 05 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,500 $7,500 Not Implemented
MA0114 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $10,888 Implemented
MA0114 # 02 Y:1988 02 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,355 $8,000 Implemented
MA0114 # 03 Y:1988 03 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $192 $0 Not Implemented
MA0114 # 04 Y:1988 04 1988 OPTIMIZE PLANT POWER FACTOR $9,930 $23,000 Implemented
MA0114 # 05 Y:1988 05 1988 RECOVER WASTE HEAT FROM EQUIPMENT $419 $1,250 Not Implemented