Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 3569 | General Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0139 # 01 Y:1988 | 01 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $6,928 | $2,859 | Implemented |
MA0139 # 02 Y:1988 | 02 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,534 | $85,000 | Implemented |
MA0139 # 03 Y:1988 | 03 | 1988 | OPTIMIZE PLANT POWER FACTOR | $19,447 | $9,000 | Implemented |
MA0139 # 04 Y:1988 | 04 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,222 | $3,943 | Not Implemented |
MA0139 # 05 Y:1988 | 05 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,467 | $72,797 | Not Implemented |
KU0259 # 01 Y:1988 | 01 | 1988 | INSTALL SET-BACK TIMERS | $1,275 | $227 | Implemented |
KU0259 # 10 Y:1988 | 10 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $105 | $0 | Implemented |
KU0259 # 09 Y:1988 | 09 | 1988 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $149 | $160 | Not Implemented |
KU0259 # 08 Y:1988 | 08 | 1988 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $225 | $150 | Implemented |
KU0259 # 07 Y:1988 | 07 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $285 | $0 | Implemented |
KU0259 # 06 Y:1988 | 06 | 1988 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $323 | $0 | Implemented |
KU0259 # 05 Y:1988 | 05 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $330 | $30 | Implemented |
KU0259 # 04 Y:1988 | 04 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $390 | $120 | Implemented |
KU0259 # 03 Y:1988 | 03 | 1988 | INSULATE BARE EQUIPMENT | $495 | $215 | Not Implemented |
KU0259 # 02 Y:1988 | 02 | 1988 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $7,290 | $0 | Not Implemented |
TN0347 # 06 Y:1988 | 06 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,926 | $575 | Implemented |
TN0347 # 05 Y:1988 | 05 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,040 | $1,750 | Implemented |
TN0347 # 04 Y:1988 | 04 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,122 | $180 | Implemented |
TN0347 # 03 Y:1988 | 03 | 1988 | INSTALL SET-BACK TIMERS | $4,365 | $0 | Implemented |
TN0347 # 02 Y:1988 | 02 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $5,095 | $560 | Not Implemented |
TN0347 # 01 Y:1988 | 01 | 1988 | KEEP LAMPS AND REFLECTORS CLEAN | $15,953 | $64,009 | Implemented |
OK0262 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,610 | $9,800 | Not Implemented |
OK0262 # 05 Y:1988 | 05 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $982 | $840 | Implemented |
OK0262 # 04 Y:1988 | 04 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,786 | $0 | Implemented |
OK0262 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $495 | $0 | Implemented |