Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 3577 | Computer Peripheral Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0674 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,830 | $250 | Implemented |
CO0674 # 04 Y:2013 | 04 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,320 | $500 | Not Implemented |
CO0674 # 03 Y:2013 | 03 | 2013 | AIR CONDITION ONLY SPACE NECESSARY | $3,740 | $0 | Not Implemented |
CO0674 # 02 Y:2013 | 02 | 2013 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $4,510 | $13,600 | Not Implemented |
CO0674 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,670 | $310 | Implemented |
CO0439 # 04 Y:1999 | 04 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,620 | $8,400 | Implemented |
CO0439 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,900 | $2,000 | Implemented |
CO0439 # 02 Y:1999 | 02 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $102,440 | $400,000 | Not Implemented |
CO0439 # 01 Y:1999 | 01 | 1999 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $187,200 | $13,080 | Implemented |
CO0276 # 01 Y:1993 | 01 | 1993 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $11,300 | $600 | Not Implemented |
CO0276 # 04 Y:1993 | 04 | 1993 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $860 | $850 | Not Implemented |
CO0276 # 03 Y:1993 | 03 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,380 | $1,580 | Not Implemented |
CO0276 # 02 Y:1993 | 02 | 1993 | INSTALL OCCUPANCY SENSORS | $1,750 | $1,000 | Not Implemented |
CO0250 # 01 Y:1992 | 01 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $4,930 | $167,000 | Implemented |
CO0250 # 12 Y:1992 | 12 | 1992 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $240 | $1,120 | Implemented |
CO0250 # 11 Y:1992 | 11 | 1992 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $140 | $240 | Implemented |
CO0250 # 10 Y:1992 | 10 | 1992 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $810 | $2,600 | Implemented |
CO0250 # 09 Y:1992 | 09 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,900 | $8,300 | Implemented |
CO0250 # 08 Y:1992 | 08 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,410 | $6,230 | Implemented |
CO0250 # 07 Y:1992 | 07 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $350 | $300 | Implemented |
CO0250 # 06 Y:1992 | 06 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $450 | $150 | Implemented |
CO0250 # 05 Y:1992 | 05 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,939 | $8,660 | Implemented |
CO0250 # 04 Y:1992 | 04 | 1992 | REDUCE VENTILATION AIR | $6,040 | $1,270 | Implemented |
CO0250 # 03 Y:1992 | 03 | 1992 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,930 | $2,670 | Implemented |
CO0250 # 02 Y:1992 | 02 | 1992 | USE POWER DURING OFF-PEAK PERIODS | $12,960 | $250 | Implemented |