Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,655
matching recommendationsSIC | 358 | Refrigeration And Service Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0425 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,908 | $100 | Not Implemented |
SD0425 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,098 | $100 | Not Implemented |
SD0425 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,468 | $1,000 | Not Implemented |
SD0425 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $496 | $1,334 | Implemented |
SD0425 # 05 Y:2010 | 05 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $42,485 | $260,000 | Implemented |
MS0349 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,903 | $31,050 | Implemented |
MS0349 # 02 Y:2010 | 02 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,920 | $140 | Not Implemented |
MS0349 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,685 | $389 | Implemented |
MS0349 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $3,399 | $671 | Not Implemented |
DL0042 # 01 Y:2009 | 01 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,756 | $0 | Implemented |
DL0042 # 02 Y:2009 | 02 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $10,180 | $19,200 | Not Implemented |
DL0042 # 03 Y:2009 | 03 | 2009 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $28,200 | $1,760 | Implemented |
DL0042 # 04 Y:2009 | 04 | 2009 | ADD AREA LIGHTING SWITCHES | $11,009 | $1,325 | Not Implemented |
DL0042 # 05 Y:2009 | 05 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,332 | $368 | Not Implemented |
DL0042 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $982 | $500 | Not Implemented |
DL0042 # 07 Y:2009 | 07 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,600 | $36,600 | Not Implemented |
DL0042 # 08 Y:2009 | 08 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,400 | $41,000 | Not Implemented |
DL0042 # 09 Y:2009 | 09 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $469 | $4,845 | Not Implemented |
SD0417 # 01 Y:2009 | 01 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,063 | $19,400 | Not Implemented |
SD0417 # 02 Y:2009 | 02 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,436 | $26,587 | Not Implemented |
SD0417 # 03 Y:2009 | 03 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,630 | $4,249 | Not Implemented |
SD0417 # 04 Y:2009 | 04 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,003 | $16,190 | Not Implemented |
SD0417 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,392 | $14,325 | Not Implemented |
SD0417 # 06 Y:2009 | 06 | 2009 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $43,985 | $8,096 | Not Implemented |
GT0864 # 01 Y:2009 | 01 | 2009 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,717 | $0 | Not Implemented |