IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,655

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0258 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,870 $753 Implemented
IA0258 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $40 Not Implemented
IA0258 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $288 $25 Implemented
IA0258 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,920 $1,206 Implemented
IA0258 # 06 Y:2000 06 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $47,250 $7,175 Not Implemented
IA0258 # 07 Y:2000 07 2000 CONVERT TO AQUEOUS CLEANING SYSTEM $56,437 $420 Not Implemented
IA0242 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,701 $169 Not Implemented
IA0242 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $833 $1,167 Not Implemented
IA0242 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $604 $2,000 Not Implemented
IA0242 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $276 $45 Not Implemented
IA0242 # 05 Y:2000 05 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $79 $25 Not Implemented
IA0242 # 06 Y:2000 06 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,636 $675 Not Implemented
IA0242 # 07 Y:2000 07 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $448 $890 Not Implemented
IA0242 # 08 Y:2000 08 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,883 $123 Not Implemented
IA0242 # 09 Y:2000 09 2000 APPLY FOR INVESTMENT INCENTIVES $3,531 $250 Not Implemented
MS0156 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $31,264 $583 Not Implemented
MS0156 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,681 $200 Implemented
MS0156 # 03 Y:2000 03 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,566 $0 Not Implemented
MS0156 # 04 Y:2000 04 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $74,209 $6,000 Implemented
NC0183 # 01 Y:2000 01 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,429 $2,731 Implemented
NC0183 # 02 Y:2000 02 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,611 $11,000 Implemented
NC0183 # 03 Y:2000 03 2000 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $3,631 $7,500 Not Implemented
NC0183 # 04 Y:2000 04 2000 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,091 $3,300 Implemented
NC0183 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $884 $600 Implemented
NC0183 # 06 Y:2000 06 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,983 $10,750 Not Implemented