IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,655

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0091 # 04 Y:1983 04 1983 INSTALL AUTOMATIC STACK DAMPER $300 $300 Not Implemented
KU0091 # 05 Y:1983 05 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $223 $90 Not Implemented
TN0171 # 01 Y:1983 01 1983 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,000 $13,000 Not Implemented
TN0171 # 02 Y:1983 02 1983 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,000 $0 Not Implemented
TN0171 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $3,800 $400 Not Implemented
UD0084 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,160 $1,527 Not Implemented
UD0084 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,999 $1,500 Not Implemented
UD0084 # 03 Y:1983 03 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,060 $1,000 Not Implemented
UD0084 # 04 Y:1983 04 1983 INSTALL STORM WINDOWS AND DOORS $4,907 $6,932 Not Implemented
UD0084 # 05 Y:1983 05 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,800 $8,000 Not Implemented
GT0121 # 01 Y:1982 01 1982 AIR CONDITION ONLY SPACE NECESSARY $6,710 $2,169 Not Implemented
GT0121 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $6,280 $2,000 Implemented
GT0121 # 03 Y:1982 03 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,493 $5,400 Not Implemented
GT0121 # 04 Y:1982 04 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,683 $762 Not Implemented
GT0121 # 05 Y:1982 05 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,259 $7,860 Not Implemented
KU0041 # 01 Y:1982 01 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,933 $0 Not Implemented
KU0041 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,751 $7,500 Implemented
KU0041 # 03 Y:1982 03 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,027 $287 Not Implemented
KU0041 # 04 Y:1982 04 1982 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $738 $1,800 Not Implemented
KU0041 # 05 Y:1982 05 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,547 $0 Not Implemented
KU0041 # 06 Y:1982 06 1982 RECOVER WASTE HEAT FROM EQUIPMENT $1,134 $800 Not Implemented
TN0112 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $594 $600 Not Implemented
TN0112 # 02 Y:1982 02 1982 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,363 $305 Not Implemented
TN0112 # 03 Y:1982 03 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,164 $8,376 Not Implemented
KU0016 # 01 Y:1981 01 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $497 $1,471 Not Implemented