IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0800 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $860 $1,865 Implemented
OK0800 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,134 $706 Implemented
OK0800 # 07 Y:2010 07 2010 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $3,127 $0 Not Implemented
OK0800 # 02 Y:2010 02 2010 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,667 $2,700 Implemented
OK0800 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,533 $32,670 Not Implemented
OK0800 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,134 $1,678 Implemented
OK0800 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $209 $334 Implemented
OK0796 # 07 Y:2010 07 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,028 $23,000 Not Implemented
OK0796 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $16,798 $29,735 Not Implemented
OK0796 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,028 $14,578 Implemented
OK0796 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,383 $500 Implemented
OK0796 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,660 $1,378 Not Implemented
OK0796 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,129 $5,526 Implemented
OK0796 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $217 Not Implemented
OK0796 # 08 Y:2010 08 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $786 $1,850 Implemented
OK0689 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,079 $2,156 Implemented
OK0689 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,393 $758 Not Implemented
OK0689 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,521 $472 Not Implemented
OK0689 # 02 Y:2004 02 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $857 $0 Not Implemented
OK0689 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,433 $252 Implemented
OK0689 # 05 Y:2004 05 2004 INSTALL SET-BACK TIMERS $853 $822 Not Implemented
OK0689 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,021 $1,180 Not Implemented
OK0661 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,319 $823 Implemented
OK0661 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $1,271 $3,206 Not Implemented
OK0661 # 06 Y:2003 06 2003 USE COMPRESSOR AIR FILTERS $3,339 $168 Not Implemented