IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0305 # 09 Y:2016 09 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $342 $760 Not Implemented
MI0305 # 11 Y:2016 11 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $35 $19 Implemented
MI0305 # 10 Y:2016 10 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $203 $50 Implemented
MI0305 # 08 Y:2016 08 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $380 $780 Implemented
MI0305 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,203 $2,914 Not Implemented
MI0305 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $1,359 $2,950 Not Implemented
MI0305 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,903 $1,473 Not Implemented
MI0305 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,269 $19,877 Not Implemented
MI0305 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,922 $1,700 Implemented
MI0305 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,453 $13,550 Not Implemented
MI0305 # 01 Y:2016 01 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $21,479 $10,875 Not Implemented
UA0171 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,391 $250 Not Implemented
UA0171 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $577 $540 Implemented
UA0171 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,758 $0 Implemented
UA0171 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,551 $1,770 Implemented
UA0171 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,559 $20,740 Not Implemented
LE0417 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $715 $500 Implemented
LE0417 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,687 $1,868 Not Implemented
LE0417 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,602 $25,000 Implemented
LE0417 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,120 $22,015 Implemented
LE0417 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,659 $62,300 Implemented
LE0417 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,844 $1,000 Implemented
LE0417 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $46 Not Implemented
IP0058 # 03 Y:2016 03 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $30,281 $6,819 Not Implemented
IP0058 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $256 $51 Not Implemented