Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 358 | Refrigeration And Service Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0015 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,693 | $189,100 | Implemented |
NL0015 # 02 Y:2017 | 02 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,416 | $0 | Implemented |
NL0015 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,079 | $12,500 | Not Implemented |
NL0015 # 04 Y:2017 | 04 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,800 | $0 | Implemented |
NL0015 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,190 | $4,500 | Implemented |
WM0113 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $684 | $1,000 | Not Implemented |
WM0113 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,074 | $0 | Not Implemented |
WM0113 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,437 | $3,721 | Not Implemented |
WM0113 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,755 | $3,309 | Not Implemented |
WM0113 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,921 | $18,856 | Implemented |
WM0113 # 01 Y:2017 | 01 | 2017 | USE SYNTHETIC LUBRICANT | $21,176 | $32,727 | Not Implemented |
WM0113 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $235 | $800 | Not Implemented |
AS0446 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,288 | $1,482 | Not Implemented |
AS0446 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $982 | $950 | Not Implemented |
AS0446 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,695 | $180 | Implemented |
OK0973 # 06 Y:2017 | 06 | 2017 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $860 | $769 | Not Implemented |
OK0973 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,356 | $19,135 | Not Implemented |
OK0973 # 08 Y:2017 | 08 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,658 | $1,650 | Not Implemented |
OK0973 # 09 Y:2017 | 09 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,097 | $991 | Not Implemented |
OK0973 # 10 Y:2017 | 10 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,050 | $510 | Not Implemented |
OK0973 # 05 Y:2017 | 05 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,172 | $0 | Not Implemented |
OK0973 # 04 Y:2017 | 04 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,431 | $12,360 | Not Implemented |
OK0973 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $534 | $2,111 | Not Implemented |
OK0973 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,650 | $9,471 | Not Implemented |
OK0973 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,201 | $28,109 | Not Implemented |