Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,086
matching recommendationsSIC | 3585 | Refrigeration And Heating Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0001 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $1,478 | $3,204 | Implemented |
IC0001 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $228 | $1,370 | Implemented |
IC0001 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,986 | $68,895 | Implemented |
IC0001 # 08 Y:2001 | 08 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,227 | $3,266 | Implemented |
IC0001 # 09 Y:2001 | 09 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $110,160 | $64 | Not Implemented |
IC0001 # 10 Y:2001 | 10 | 2001 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $367,200 | $826,000 | Not Implemented |
IC0001 # 11 Y:2001 | 11 | 2001 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $612,000 | $900,000 | Not Implemented |
IC0001 # 12 Y:2001 | 12 | 2001 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $300,000 | $840,000 | Implemented |
TN0694 # 01 Y:2000 | 01 | 2000 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $219,860 | $100,000 | Not Implemented |
TN0694 # 02 Y:2000 | 02 | 2000 | ADD AREA LIGHTING SWITCHES | $17,510 | $25,030 | Implemented |
TN0694 # 03 Y:2000 | 03 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $10,755 | $5,075 | Implemented |
TN0694 # 04 Y:2000 | 04 | 2000 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $10,130 | $181,580 | Not Implemented |
TN0694 # 05 Y:2000 | 05 | 2000 | OPTIMIZE PLANT POWER FACTOR | $8,665 | $26,260 | Not Implemented |
TN0694 # 06 Y:2000 | 06 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,210 | $18,900 | Not Implemented |
TN0694 # 07 Y:2000 | 07 | 2000 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $4,345 | $9,100 | Not Implemented |
TN0694 # 08 Y:2000 | 08 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $3,600 | $7,000 | Not Implemented |
TN0694 # 09 Y:2000 | 09 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,795 | $1,875 | Not Implemented |
TN0694 # 10 Y:2000 | 10 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,185 | $3,570 | Not Implemented |
TN0694 # 11 Y:2000 | 11 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,365 | $0 | Implemented |
IA0242 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,701 | $169 | Not Implemented |
IA0242 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $833 | $1,167 | Not Implemented |
IA0242 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $604 | $2,000 | Not Implemented |
IA0242 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $276 | $45 | Not Implemented |
IA0242 # 05 Y:2000 | 05 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $79 | $25 | Not Implemented |
IA0242 # 06 Y:2000 | 06 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,636 | $675 | Not Implemented |