Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,067

matching recommendations
Reset
SIC 3585 Refrigeration And Heating Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0015 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,814 $0 Implemented
AS0015 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,240 $808 Not Implemented
AS0015 # 05 Y:1990 05 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,041 $0 Implemented
AS0015 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,214 $520 Not Implemented
AS0015 # 07 Y:1990 07 1990 KEEP LAMPS AND REFLECTORS CLEAN $15,919 $20,225 Implemented
AS0015 # 08 Y:1990 08 1990 INSTALL SET-BACK TIMERS $1,698 $450 Implemented
AS0015 # 09 Y:1990 09 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,119 $2,775 Not Implemented
AS0015 # 10 Y:1990 10 1990 RECOVER WASTE HEAT FROM EQUIPMENT $2,463 $1,760 Not Implemented
MO0010 # 01 Y:1990 01 1990 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $11,076 $1,932 Implemented
MO0010 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,744 $900 Implemented
MO0010 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,455 $921 Implemented
MO0010 # 04 Y:1990 04 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,259 $0 Implemented
MO0010 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $565 $150 Implemented
MO0010 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $361 $600 Not Implemented
MO0010 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $224 $150 Not Implemented
WI0056 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $35,807 $0 Implemented
WI0056 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $34,447 $11,000 Implemented
WI0056 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,617 $12,685 Implemented
WI0056 # 04 Y:1989 04 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,544 $5,000 Implemented
WI0056 # 05 Y:1989 05 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,914 $0 Not Implemented
WI0056 # 06 Y:1989 06 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $1,809 $2,000 Not Implemented
WI0056 # 07 Y:1989 07 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,681 $5,000 Implemented
WI0056 # 08 Y:1989 08 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,664 $500 Implemented
WI0056 # 09 Y:1989 09 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,120 $0 Not Implemented
AT0115 # 01 Y:1988 01 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $492 $460 Not Implemented