Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 3585 | Refrigeration And Heating Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0113 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $235 | $800 | Not Implemented |
WM0113 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $684 | $1,000 | Not Implemented |
WM0113 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,074 | $0 | Not Implemented |
WM0113 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,437 | $3,721 | Not Implemented |
WM0113 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,755 | $3,309 | Not Implemented |
WM0113 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,921 | $18,856 | Implemented |
WM0113 # 01 Y:2017 | 01 | 2017 | USE SYNTHETIC LUBRICANT | $21,176 | $32,727 | Not Implemented |
WI0305 # 03 Y:1997 | 03 | 1997 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $16,529 | $30,000 | Not Implemented |
WI0305 # 07 Y:1997 | 07 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,234 | $740 | Implemented |
WI0305 # 06 Y:1997 | 06 | 1997 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,342 | $10,000 | Not Implemented |
WI0305 # 05 Y:1997 | 05 | 1997 | TREAT AND REUSE RINSE WATERS | $9,755 | $12,000 | Not Implemented |
WI0305 # 04 Y:1997 | 04 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $14,956 | $1,000 | Implemented |
WI0305 # 02 Y:1997 | 02 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $21,896 | $55,000 | Not Implemented |
WI0305 # 01 Y:1997 | 01 | 1997 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $28,500 | $4,500 | Implemented |
WI0056 # 01 Y:1989 | 01 | 1989 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $35,807 | $0 | Implemented |
WI0056 # 09 Y:1989 | 09 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,120 | $0 | Not Implemented |
WI0056 # 08 Y:1989 | 08 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,664 | $500 | Implemented |
WI0056 # 07 Y:1989 | 07 | 1989 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,681 | $5,000 | Implemented |
WI0056 # 06 Y:1989 | 06 | 1989 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,809 | $2,000 | Not Implemented |
WI0056 # 05 Y:1989 | 05 | 1989 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,914 | $0 | Not Implemented |
WI0056 # 04 Y:1989 | 04 | 1989 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,544 | $5,000 | Implemented |
WI0056 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,617 | $12,685 | Implemented |
WI0056 # 02 Y:1989 | 02 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $34,447 | $11,000 | Implemented |