IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

202

matching recommendations
Reset
SIC 3589 Service Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0457 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $687 $1,625 Implemented
SD0100 # 02 Y:1994 02 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,434 $2,000 Implemented
SD0100 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $93 $140 Implemented
SD0100 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $405 $43 Implemented
SD0100 # 06 Y:1994 06 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $4,373 $3,675 Implemented
SD0100 # 09 Y:1994 09 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $89 $50 Implemented
HO0072 # 06 Y:1994 06 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $467 $472 Implemented
WI0187 # 01 Y:1993 01 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,534 $750 Implemented
WI0187 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $343 $184 Implemented
WI0187 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $278 $40 Implemented
WI0187 # 08 Y:1993 08 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $120 Implemented
AS0091 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,516 $0 Implemented
AS0091 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27 $141 Implemented
AS0091 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $150 $110 Implemented
WI0156 # 01 Y:1992 01 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,451 $0 Implemented
WI0156 # 02 Y:1992 02 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,308 $10,000 Implemented
WI0156 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $2 Implemented
WI0156 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $622 $1 Implemented
WI0156 # 05 Y:1992 05 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $184 $0 Implemented
WI0156 # 07 Y:1992 07 1992 SHUT OFF PILOTS IN STANDBY EQUIPMENT $136 $0 Implemented
WI0156 # 09 Y:1992 09 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $142 $640 Implemented
RU0137 # 01 Y:1992 01 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $680 $426 Implemented
RU0137 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $121 $2,197 Implemented
RU0137 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $476 $500 Implemented
RU0137 # 06 Y:1992 06 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,441 $0 Implemented