IAC logo
IAC Assessment: WI0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1992
Principal Product FRYERS,BREADINGS
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 57
Plant Area (Sq.Ft.) 0
Annual Production 78,000 Pieces
Production Hrs. Annual 2,125
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,850 523,740 kWh $0.07
Natural Gas $8,091 1,892 MMBtu $4.28
TOTAL ENERGY COSTS $44,941
RECOMMENDED SAVINGS* $5,480 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,717
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,451
Cost:
-
$1,382 - $69 - - - $1,382
-
kWh
$69
-
MMBtu
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,308
Cost:
$10,000
$1,308 - - - - - $1,308
-
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$874
Cost:
$2
$908 12,896 - - $(-34) - $908
12,896
kWh
-
-
MMBtu
$(-34)
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$622
Cost:
$1
$841 12,016 $(-219) (-51) - - $841
12,016
kWh
$(-219)
(-51)
MMBtu
-
-
$
05: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$184
Cost:
-
$184 2,638 - - - - $184
2,638
kWh
-
-
MMBtu
-
-
$
06: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$452
Cost:
$500
- - $452 106 - - -
-
kWh
$452
106
MMBtu
-
-
$
07: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$136
Cost:
-
- - $136 32 - - -
-
kWh
$136
32
MMBtu
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$205
Cost:
$150
- - $205 48 - - -
-
kWh
$205
48
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$142
Cost:
$640
$142 2,052 - - - - $142
2,052
kWh
-
-
MMBtu
-
-
$
10: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$106
Cost:
$150
$106 - - - - - $106
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,480
Cost:
$11,443
$4,871 29,602 $643 135 $(-34) - $4,871
29,602
kWh
$643
135
MMBtu
$(-34)
-
$
TOTAL IMPLEMENTED Savings:
$4,717
Cost:
$10,643
$4,765 29,602 $(-14) (-19) $(-34) - $4,765
29,602
kWh
$(-14)
(-19)
MMBtu
$(-34)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes