IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

429

matching recommendations
Reset
SIC 3589 Service Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0412 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $100 $250 Implemented
GT0412 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $600 Implemented
GT0412 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,175 $1,366 Not Implemented
GT0412 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $331 $175 Implemented
GT0412 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $120 $130 Implemented
GT0412 # 06 Y:1990 06 1990 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $7,340 $66,000 Not Implemented
WI0019 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $1,190 $0 Not Implemented
WI0019 # 02 Y:1988 02 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $540 $0 Not Implemented
WI0019 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $926 $1,257 Not Implemented
WI0019 # 04 Y:1988 04 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,292 $0 Not Implemented
WI0019 # 05 Y:1988 05 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,248 $5,600 Not Implemented
UD0246 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,261 $0 Implemented
UD0246 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,946 $100,000 Implemented
UD0246 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,694 $32,400 Implemented
UD0246 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $4,414 $3,400 Implemented
UD0246 # 06 Y:1988 06 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,171 $4,000 Not Implemented
OK0227 # 01 Y:1987 01 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,433 $3,500 Implemented
OK0227 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $520 $120 Implemented
OK0227 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $268 $0 Implemented
OK0227 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $626 $216 Not Implemented
OK0227 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $162 $400 Not Implemented
OK0227 # 06 Y:1987 06 1987 RECOVER WASTE HEAT FROM EQUIPMENT $513 $305 Implemented
KU0191 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,594 $2,592 Implemented
KU0191 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,988 $0 Not Implemented
KU0191 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $423 $100 Implemented