IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0488 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $4,372 $4,000 Implemented
UD0488 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,843 $3,000 Implemented
UD0488 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,037 $8,010 Implemented
UD0454 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $2,446 $6,000 Implemented
UD0454 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,922 $9,785 Implemented
UD0412 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,409 $0 Implemented
UD0396 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $71 $15 Implemented
UD0396 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $745 $700 Implemented
UD0303 # 01 Y:1990 01 1990 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,148 $0 Implemented
UD0303 # 02 Y:1990 02 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $761 $800 Implemented
UD0303 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,496 $3,102 Implemented
UD0304 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,928 $4,920 Implemented
UD0304 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $332 $0 Implemented
UD0304 # 05 Y:1990 05 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,558 $1,500 Implemented
UD0194 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,611 $12,000 Implemented
UD0194 # 02 Y:1986 02 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,065 $1,160 Implemented
UD0194 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $2,063 $1,000 Implemented
UD0194 # 04 Y:1986 04 1986 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,352 $1,500 Implemented
UD0152 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $749 $99 Implemented
UD0061 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $72 $0 Implemented
UD0045 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $229 $400 Implemented
UD0045 # 02 Y:1982 02 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,586 $7,000 Implemented
UD0045 # 03 Y:1982 03 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,451 $3,100 Implemented
UD0041 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,083 $590 Implemented
UD0041 # 04 Y:1982 04 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $420 $0 Implemented