Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1120 # 07 Y:2024 07 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,779 $13,845 n/a
OK1120 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $585 $295 n/a
OK1120 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,219 $310 n/a
OK1120 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,418 $8,695 n/a
OK1120 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $865 $0 n/a
OK1120 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,337 $0 n/a
OK1120 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $8,003 $91,875 n/a
OK1112 # 07 Y:2024 07 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $52,088 $38,766 n/a
OK1112 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $681 $100 n/a
OK1112 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,785 $105,814 n/a
OK1112 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,481 $488 n/a
OK1112 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,259 $17,620 n/a
OK1112 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,199 $0 n/a
OK1112 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,094 $626 n/a
OK0815 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $2,608 $2,198 Not Implemented
OK0815 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $3,531 $633 Implemented
OK0815 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,335 $20,544 Not Implemented
OK0815 # 07 Y:2011 07 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $15,876 $3,096 Not Implemented
OK0815 # 06 Y:2011 06 2011 DISCONNECT BALLASTS $849 $696 Not Implemented
OK0815 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $950 Implemented
OK0815 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,341 $930 Implemented
OK0815 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,351 $0 Implemented
OK0815 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $57,281 $13,000 Not Implemented
OK0794 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $4,978 Not Implemented
OK0794 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,300 $68,625 Not Implemented