IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0072 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,720 $671 Implemented
IP0072 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $415 $78 Implemented
IP0072 # 06 Y:2016 06 2016 INSTALL TIMERS AND/OR THERMOSTATS $1,837 $555 Implemented
IP0072 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $391 $768 Implemented
IP0072 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,378 $6,703 Implemented
IP0011 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,428 $0 Implemented
IP0011 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $13,897 $0 Implemented
IP0011 # 02 Y:2013 02 2013 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $12,093 $0 Implemented
IP0011 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,010 $27,442 Implemented
IP0011 # 08 Y:2013 08 2013 OPTIMIZE PLANT POWER FACTOR $14,000 $9,864 Not Implemented
IP0011 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,449 $1,081 Not Implemented
IP0011 # 06 Y:2013 06 2013 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $131,250 $15,000 Not Implemented
IP0011 # 05 Y:2013 05 2013 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $980 $0 Implemented
IP0011 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,058 $0 Implemented
IP0004 # 02 Y:2012 02 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,343 $0 Implemented
IP0004 # 06 Y:2012 06 2012 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $10,500 $27,000 Not Implemented
IP0004 # 05 Y:2012 05 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,462 $15,867 Not Implemented
IP0004 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,686 $18,150 Implemented
IP0004 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,110 $0 Implemented
IP0004 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,520 $0 Implemented
ND0359 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $858 $195 Implemented
ND0359 # 02 Y:2000 02 2000 DEVELOP A REPAIR/REPLACE POLICY $4,437 $17,206 Not Implemented
ND0359 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $721 $800 Not Implemented
ND0359 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,477 $8,551 Implemented
ND0359 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $207 $280 Implemented