IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,249

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0072 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,378 $6,703 Implemented
IA0560 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,818 $1,011 Implemented
IA0560 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,092 $200 Implemented
IA0560 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $1,223 $1,200 Not Implemented
IA0560 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $819 $1,000 Implemented
MZ0214 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,834 $28,800 Implemented
MZ0214 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,444 $2,000 Not Implemented
MZ0214 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $860 Implemented
MZ0214 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,228 $1,100 Implemented
MZ0214 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $2,958 $1,650 Not Implemented
SD0527 # 01 Y:2016 01 2016 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,997 $600 Not Implemented
SD0527 # 02 Y:2016 02 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $14,603 $79,274 Implemented
SD0527 # 03 Y:2016 03 2016 INSTALL TIMERS AND/OR THERMOSTATS $11,123 $560 Not Implemented
SD0527 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,941 $13,433 Not Implemented
SD0527 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $6,598 $200 Not Implemented
SD0527 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,151 $7,500 Not Implemented
SD0527 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,088 $1,000 Not Implemented
SD0527 # 08 Y:2016 08 2016 USE PHOTOCELL CONTROLS $1,432 $1,665 Not Implemented
SD0527 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $701 $200 Not Implemented
SD0527 # 10 Y:2016 10 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $463 $1,300 Not Implemented
AM0690 # 01 Y:2015 01 2015 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $17,950 $12,830 Not Implemented
AM0690 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,320 $2,000 Not Implemented
AM0690 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $14,550 $31,640 Not Implemented
AM0690 # 04 Y:2015 04 2015 OPTIMIZE PLANT POWER FACTOR $11,210 $21,860 Not Implemented
AM0690 # 05 Y:2015 05 2015 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,400 $9,800 Not Implemented