IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0621 # 01 Y:2001 01 2001 REPROCESS SPENT OILS ON SITE FOR RE-USE $39,420 $0 Not Implemented
UD0621 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $11,768 $0 Implemented
UD0621 # 03 Y:2001 03 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,723 $0 Implemented
UD0621 # 04 Y:2001 04 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,298 $3,000 Not Implemented
UD0621 # 05 Y:2001 05 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,092 $2,000 Implemented
UD0621 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $1,280 $2,460 Implemented
UD0621 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $966 $2,220 Not Implemented
UD0621 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $396 $0 Not Implemented
UU0001 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $107 Not Implemented
UU0001 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,462 $300 Implemented
UU0001 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $265 $837 Not Implemented
UU0001 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,268 $2,762 Not Implemented
UU0001 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $161 $156 Not Implemented
UU0001 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $947 $0 Implemented
UU0001 # 07 Y:2001 07 2001 USE SYNTHETIC LUBRICANT $220 $400 Not Implemented
UU0001 # 08 Y:2001 08 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $292 $1,060 Not Implemented
MA0486 # 01 Y:2001 01 2001 $19,200 $0 Not Implemented
MA0486 # 02 Y:2001 02 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,500 $800 Implemented
MA0486 # 03 Y:2001 03 2001 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,300 $25,000 Not Implemented
MA0486 # 04 Y:2001 04 2001 $3,300 $0 Implemented
MA0486 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,700 $5,000 Implemented
MA0486 # 06 Y:2001 06 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,400 $8,000 Not Implemented
MA0486 # 07 Y:2001 07 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $350 Implemented
MA0486 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $800 $1,100 Implemented
MA0486 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $300 $2,000 Not Implemented