Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
221
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0140 # 09 Y:1999 | 09 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $30,353 | $10,000 | Implemented |
BD0140 # 10 Y:1999 | 10 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $3,427 | $3,000 | Not Implemented |
BD0140 # 11 Y:1999 | 11 | 1999 | MINIMIZE WATER USAGE | $1,471 | $2,590 | Implemented |
BD0140 # 12 Y:1999 | 12 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $243,360 | $500,000 | Implemented |
BD0140 # 13 Y:1999 | 13 | 1999 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $107,799 | $26,500 | Implemented |
BD0140 # 14 Y:1999 | 14 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $31,200 | $16,000 | Implemented |
WI0350 # 01 Y:1999 | 01 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,546 | $13,122 | Implemented |
WI0350 # 02 Y:1999 | 02 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,263 | $500 | Not Implemented |
WI0350 # 03 Y:1999 | 03 | 1999 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $1,981 | $0 | Not Implemented |
WI0350 # 04 Y:1999 | 04 | 1999 | REDUCE VENTILATION AIR | $1,508 | $1,000 | Not Implemented |
WI0350 # 05 Y:1999 | 05 | 1999 | USE OPTIMUM THICKNESS INSULATION | $1,212 | $1,538 | Not Implemented |
WI0350 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $474 | $500 | Implemented |
WI0350 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $456 | $740 | Implemented |
WI0248 # 01 Y:1995 | 01 | 1995 | INSTALL TIMERS AND/OR THERMOSTATS | $3,240 | $800 | Implemented |
WI0248 # 02 Y:1995 | 02 | 1995 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,647 | $7,000 | Implemented |
WI0248 # 03 Y:1995 | 03 | 1995 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,170 | $1,000 | Implemented |
WI0248 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $779 | $640 | Not Implemented |
WI0248 # 05 Y:1995 | 05 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $656 | $2,000 | Implemented |
WI0248 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $539 | $2,160 | Not Implemented |
WI0248 # 07 Y:1995 | 07 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $157 | $514 | Implemented |
WI0248 # 08 Y:1995 | 08 | 1995 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $488 | $0 | Implemented |
WI0248 # 09 Y:1995 | 09 | 1995 | TURN OFF EQUIPMENT WHEN NOT IN USE | $276 | $0 | Implemented |
BD0029 # 01 Y:1995 | 01 | 1995 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $29 | $126 | Not Implemented |
BD0029 # 02 Y:1995 | 02 | 1995 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,170 | $2,100 | Not Implemented |
BD0029 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $297 | $679 | Not Implemented |