IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,249

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0073 # 01 Y:1994 01 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $348 $20 Implemented
SD0073 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $593 $334 Implemented
SD0073 # 03 Y:1994 03 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,860 $240 Implemented
SD0073 # 04 Y:1994 04 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $147 $75 Implemented
SD0073 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $305 $175 Implemented
SD0073 # 06 Y:1994 06 1994 USE POWER DURING OFF-PEAK PERIODS $1,046 $0 Implemented
WI0199 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,320 $1,800 Not Implemented
WI0199 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $1,834 $825 Not Implemented
WI0199 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $817 $1,276 Implemented
WI0199 # 04 Y:1994 04 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,819 $15,000 Not Implemented
WI0199 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,504 $600 Not Implemented
WI0199 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $725 $640 Implemented
WI0199 # 07 Y:1994 07 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $726 $1,000 Implemented
WI0199 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $342 $77 Implemented
MA0288 # 01 Y:1993 01 1993 RECOVER AND REUSE COOLING WATER $31,246 $14,546 Not Implemented
MA0288 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $12,032 $0 Not Implemented
MA0288 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,138 $6,840 Not Implemented
MA0288 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $2,436 $9,790 Not Implemented
MA0288 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,263 $0 Implemented
UD0412 # 01 Y:1993 01 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,246 $0 Not Implemented
UD0412 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,409 $0 Implemented
UD0412 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $3,091 Not Implemented
UD0412 # 04 Y:1993 04 1993 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,600 $0 Not Implemented
AS0095 # 01 Y:1993 01 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $163 $200 Not Implemented
AS0095 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $432 $200 Implemented