IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0015 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $278 $400 n/a
CC0015 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,040 $7,085 n/a
CC0015 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,983 $2,000 n/a
CC0015 # 04 Y:2023 04 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $199 $360 n/a
NC0653 # 01 Y:2020 01 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,814 $4,460 Not Implemented
NC0653 # 02 Y:2020 02 2020 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $22,483 $4,000 Not Implemented
NC0653 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $382,429 $2,300,000 Not Implemented
NC0580 # 09 Y:2016 09 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $67 $100 Implemented
NC0580 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,938 $9,207 Implemented
NC0580 # 07 Y:2016 07 2016 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,280 $1,300 Not Implemented
NC0580 # 06 Y:2016 06 2016 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $2,084 $50 Not Implemented
NC0580 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $434 $150 Not Implemented
NC0580 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $110 $400 Not Implemented
NC0580 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,544 $29,200 Implemented
NC0580 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $513 $100 Implemented
NC0580 # 01 Y:2016 01 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,781 $4,200 Not Implemented
NC0459 # 09 Y:2012 09 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $313 $750 Implemented
NC0459 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,985 $600 Implemented
NC0459 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $222 $300 Implemented
NC0459 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,036 $624 Not Implemented
NC0459 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,052 $1,980 Not Implemented
NC0459 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,710 $4,085 Not Implemented
NC0459 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,925 $8,552 Implemented
NC0459 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,453 $152,640 Implemented
NC0459 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,477 $67,898 Implemented