IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0291 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $396 $150 Not Implemented
UM0291 # 07 Y:2005 07 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,325 $1,265 Implemented
UM0291 # 06 Y:2005 06 2005 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $2,309 $39,000 Not Implemented
UM0291 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,841 $1,490 Not Implemented
UM0291 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,427 $1,900 Implemented
UM0291 # 03 Y:2005 03 2005 COVER OPEN TANKS $4,518 $2,366 Implemented
UM0291 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,293 $9,000 Implemented
UM0291 # 02 Y:2005 02 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $18,138 $19,073 Not Implemented
TA0102 # 01 Y:2005 01 2005 USE POWER DURING OFF-PEAK PERIODS $20,445 $0 Implemented
TA0102 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,700 $1,800 Implemented
TA0102 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $0 Not Implemented
TA0102 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $148 Not Implemented
TA0102 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,027 $110 Implemented
OK0715 # 09 Y:2005 09 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $20,968 $0 Not Implemented
OK0715 # 01 Y:2005 01 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,938 $3,936 Not Implemented
OK0715 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,522 $5,175 Not Implemented
OK0715 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,111 $918 Not Implemented
OK0715 # 08 Y:2005 08 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,361 $26,590 Not Implemented
OK0715 # 07 Y:2005 07 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $472 $1,000 Not Implemented
OK0715 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,665 $47,100 Not Implemented
OK0715 # 04 Y:2005 04 2005 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $804 $1,825 Not Implemented
OK0715 # 06 Y:2005 06 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,022 $608 Not Implemented
GT0810 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $7,399 $7,301 Not Implemented
GT0810 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,562 $7,239 Not Implemented
GT0810 # 02 Y:2005 02 2005 RECOVER AND REUSE WASTE MATERIAL $20,000 $0 Not Implemented