Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0291 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $396 | $150 | Not Implemented |
UM0291 # 07 Y:2005 | 07 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,325 | $1,265 | Implemented |
UM0291 # 06 Y:2005 | 06 | 2005 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $2,309 | $39,000 | Not Implemented |
UM0291 # 05 Y:2005 | 05 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,841 | $1,490 | Not Implemented |
UM0291 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,427 | $1,900 | Implemented |
UM0291 # 03 Y:2005 | 03 | 2005 | COVER OPEN TANKS | $4,518 | $2,366 | Implemented |
UM0291 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $20,293 | $9,000 | Implemented |
UM0291 # 02 Y:2005 | 02 | 2005 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $18,138 | $19,073 | Not Implemented |
TA0102 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $20,445 | $0 | Implemented |
TA0102 # 03 Y:2005 | 03 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,700 | $1,800 | Implemented |
TA0102 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,170 | $0 | Not Implemented |
TA0102 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $148 | Not Implemented |
TA0102 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,027 | $110 | Implemented |
OK0715 # 09 Y:2005 | 09 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $20,968 | $0 | Not Implemented |
OK0715 # 01 Y:2005 | 01 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,938 | $3,936 | Not Implemented |
OK0715 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,522 | $5,175 | Not Implemented |
OK0715 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,111 | $918 | Not Implemented |
OK0715 # 08 Y:2005 | 08 | 2005 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,361 | $26,590 | Not Implemented |
OK0715 # 07 Y:2005 | 07 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $472 | $1,000 | Not Implemented |
OK0715 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,665 | $47,100 | Not Implemented |
OK0715 # 04 Y:2005 | 04 | 2005 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $804 | $1,825 | Not Implemented |
OK0715 # 06 Y:2005 | 06 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,022 | $608 | Not Implemented |
GT0810 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $7,399 | $7,301 | Not Implemented |
GT0810 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,562 | $7,239 | Not Implemented |
GT0810 # 02 Y:2005 | 02 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $20,000 | $0 | Not Implemented |