IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0364 # 08 Y:2007 08 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,774 $640 Not Implemented
MZ0012 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $13,756 $500 Not Implemented
MZ0012 # 02 Y:2007 02 2007 ADJUST VENTS TO MINIMIZE ENERGY USE $16,589 $10,500 Not Implemented
MZ0012 # 01 Y:2007 01 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,875 $2,507 Implemented
MZ0012 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $574 $900 Implemented
MZ0012 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $215 $180 Implemented
WV0364 # 04 Y:2007 04 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $25,424 $32,700 Implemented
WV0364 # 06 Y:2007 06 2007 DEVELOP A REPAIR/REPLACE POLICY $12,941 $840 Implemented
WV0364 # 07 Y:2007 07 2007 SHUT OFF PILOTS IN STANDBY EQUIPMENT $7,757 $10,000 Not Implemented
WV0364 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,229 $40,317 Implemented
WV0364 # 01 Y:2007 01 2007 USE DEMAND CONTROLLER OR LOAD SHEDDER $37,506 $7,700 Not Implemented
WV0364 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $29,507 $12,903 Implemented
WV0364 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $28,283 $0 Implemented
WV0364 # 13 Y:2007 13 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,174 $2,445 Not Implemented
WV0364 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $5,578 Implemented
WV0364 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,393 $375 Implemented
WV0364 # 09 Y:2007 09 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,398 $1,070 Not Implemented
WV0364 # 12 Y:2007 12 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,696 $140 Implemented
LE0260 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $234 $500 Not Implemented
LE0260 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $816 $200 Not Implemented
LE0260 # 07 Y:2007 07 2007 MINIMIZE WATER USAGE $1,524 $1,000 Not Implemented
LE0260 # 06 Y:2007 06 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,799 $2,500 Not Implemented
LE0260 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,696 $1,350 Not Implemented
LE0260 # 04 Y:2007 04 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,657 $8,000 Not Implemented
LE0260 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,263 $1,000 Not Implemented