IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0197 # 01 Y:2017 01 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $19,976 $72,881 Not Implemented
TT0197 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,919 $17,290 Not Implemented
TT0197 # 03 Y:2017 03 2017 APPLY FOR INVESTMENT INCENTIVES $31,640 $150 Implemented
TT0197 # 04 Y:2017 04 2017 OPTIMIZE PLANT POWER FACTOR $6,006 $10,000 Not Implemented
TT0197 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,267 $3,050 Not Implemented
OR0689 # 04 Y:2017 04 2017 REDUCE VENTILATION AIR $3,492 $12,558 Not Implemented
OR0689 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,595 $5,595 Implemented
OR0689 # 02 Y:2017 02 2017 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $18,000 $1,495 Implemented
OR0689 # 01 Y:2017 01 2017 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $12,509 $19,000 Implemented
MA0782 # 05 Y:2017 05 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $160 $100 Not Implemented
MA0782 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $277 $100 Implemented
MA0782 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,366 $600 Implemented
MA0782 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $7,638 $1,583 Implemented
MA0782 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,221 $78,750 Not Implemented
SU0445 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $368 $750 Implemented
SU0445 # 04 Y:2017 04 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $62 $237 Implemented
SU0445 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,399 $3,850 Implemented
SU0445 # 05 Y:2017 05 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $430 $1,799 Implemented
SU0445 # 01 Y:2017 01 2017 DISCONNECT BALLASTS $122 $0 Implemented
DL0176 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,117 $0 Implemented
DL0176 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,869 $2,965 Implemented
DL0176 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,798 $4,484 Implemented
DL0176 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,410 $4,465 Implemented
DL0176 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,415 $16,875 Not Implemented
DL0176 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,930 $2,190 Not Implemented