Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0126 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $17,675 | $20,960 | n/a |
CW0126 # 02 Y:2022 | 02 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $12,461 | $15,547 | n/a |
CW0126 # 03 Y:2022 | 03 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $361 | $0 | n/a |
CW0126 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,047 | $54,963 | n/a |
CW0126 # 05 Y:2022 | 05 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $10,872 | $33,000 | n/a |
CW0126 # 06 Y:2022 | 06 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $921 | $0 | n/a |
CW0126 # 07 Y:2022 | 07 | 2022 | USE SOLAR HEAT FOR HEAT | $2,171 | $13,500 | n/a |
UF0588 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,121 | $756 | Implemented |
UF0588 # 05 Y:2022 | 05 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,162 | $12,350 | Implemented |
UF0588 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,352 | $0 | Implemented |
UF0588 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,751 | $17,178 | Implemented |
UF0588 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $91,215 | $297,040 | Implemented |
UF0588 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $84,856 | $35,131 | Not Implemented |
UF0588 # 07 Y:2022 | 07 | 2022 | IMPROVE SPACE COMFORT CONDITIONING | $9,728 | $4,480 | Implemented |
UW2213 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,539 | $2,080 | Not Implemented |
UW2213 # 03 Y:2022 | 03 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $766 | $380 | Not Implemented |
UW2213 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,610 | $0 | Not Implemented |
LE0533 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,231 | $50,000 | Not Implemented |
LE0533 # 04 Y:2022 | 04 | 2022 | BURN A LESS EXPENSIVE GRADE OF FUEL | $24,359 | $62,500 | Not Implemented |
LE0533 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,161 | $4,100 | Not Implemented |
LE0533 # 02 Y:2022 | 02 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $3,206 | $3,500 | Not Implemented |
LE0533 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,998 | $18,621 | Not Implemented |
LE0533 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,903 | $6,154 | Not Implemented |
MU0009 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $348 | $795 | Implemented |
MU0009 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $352 | $0 | Implemented |