IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0364 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,229 $40,317 Implemented
WV0364 # 06 Y:2007 06 2007 DEVELOP A REPAIR/REPLACE POLICY $12,941 $840 Implemented
WV0364 # 07 Y:2007 07 2007 SHUT OFF PILOTS IN STANDBY EQUIPMENT $7,757 $10,000 Not Implemented
WV0364 # 08 Y:2007 08 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,774 $640 Not Implemented
WV0364 # 09 Y:2007 09 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,398 $1,070 Not Implemented
WV0364 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $5,578 Implemented
WV0364 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,393 $375 Implemented
WV0364 # 12 Y:2007 12 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,696 $140 Implemented
WV0211 # 09 Y:2001 09 2001 INSTALL OCCUPANCY SENSORS $1,150 $500 Implemented
WV0211 # 01 Y:2001 01 2001 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $4,516 $690 Implemented
WV0211 # 02 Y:2001 02 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $3,488 $7,385 Not Implemented
WV0211 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $65 $132 Not Implemented
WV0211 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $513 $40 Implemented
WV0211 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $518 $675 Implemented
WV0211 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $628 $560 Implemented
WV0211 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,353 $20 Not Implemented
WV0211 # 08 Y:2001 08 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,545 $400 Implemented
WV0211 # 14 Y:2001 14 2001 INSULATE BARE EQUIPMENT $261 $128 Implemented
WV0211 # 10 Y:2001 10 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $848 $120 Implemented
WV0211 # 11 Y:2001 11 2001 USE OPTIMUM THICKNESS INSULATION $538 $510 Implemented
WV0211 # 12 Y:2001 12 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $379 $2,075 Not Implemented
WV0211 # 13 Y:2001 13 2001 RECOVER WASTE HEAT FROM EQUIPMENT $474 $780 Not Implemented
WV0211 # 18 Y:2001 18 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,000 $1,300 Not Implemented
WV0211 # 17 Y:2001 17 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,662 $1,500 Not Implemented
WV0211 # 16 Y:2001 16 2001 REUSE SCRAP GLASS AS FEED STOCK $48 $0 Not Implemented