Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 3599 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2410 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,357 | $1,200 | n/a |
UL2410 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,202 | $4,083 | n/a |
UL2410 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $52,875 | $349,289 | n/a |
UL2410 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,828 | $3,060 | n/a |
UL2401 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $54,908 | $450,549 | n/a |
UL2401 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,727 | $3,600 | n/a |
UL2401 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $17,320 | $13,000 | n/a |
UL2401 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,830 | $0 | n/a |
UL2401 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,468 | $1,000 | n/a |
UL2401 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,347 | $2,270 | n/a |
UL2401 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $191 | $504 | n/a |
UL2314 # 09 Y:2023 | 09 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,470 | $15,600 | Not Implemented |
UL2314 # 08 Y:2023 | 08 | 2023 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $2,765 | $100 | Implemented |
UL2314 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $54,095 | $476,338 | Not Implemented |
UL2314 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,398 | $6,825 | Not Implemented |
UL2314 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,061 | $4,320 | Implemented |
UL2314 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,358 | $0 | Not Implemented |
UL2314 # 03 Y:2023 | 03 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,576 | $15,000 | Not Implemented |
UL2314 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,821 | $13,461 | Not Implemented |
UL2314 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $29,804 | $13,936 | Not Implemented |
UL0240 # 03 Y:2000 | 03 | 2000 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $1,113 | $700 | Not Implemented |
UL0240 # 05 Y:2000 | 05 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $1,410 | $384 | Not Implemented |
UL0240 # 04 Y:2000 | 04 | 2000 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $2,314 | $4,150 | Not Implemented |
UL0240 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,065 | $20 | Not Implemented |
UL0240 # 01 Y:2000 | 01 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,535 | $0 | Not Implemented |