Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 3599 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0595 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $119 | $85 | Implemented |
WV0595 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $188 | $305 | Implemented |
WV0595 # 07 Y:2020 | 07 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $315 | $406 | Implemented |
WV0595 # 06 Y:2020 | 06 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $650 | $1,100 | Implemented |
WV0595 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,263 | $3,355 | Implemented |
WV0595 # 04 Y:2020 | 04 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,299 | $4,225 | Not Implemented |
WV0595 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $1,313 | $6,099 | Implemented |
WV0595 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,478 | $12,144 | Not Implemented |
WV0595 # 01 Y:2020 | 01 | 2020 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,138 | $5,700 | Not Implemented |
WV0270 # 12 Y:2003 | 12 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,750 | $4,590 | Implemented |
WV0270 # 13 Y:2003 | 13 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,088 | $2,000 | Not Implemented |
WV0270 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,616 | $0 | Implemented |
WV0270 # 11 Y:2003 | 11 | 2003 | INSTALL OCCUPANCY SENSORS | $2,244 | $1,450 | Implemented |
WV0270 # 10 Y:2003 | 10 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,296 | $735 | Not Implemented |
WV0270 # 09 Y:2003 | 09 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,937 | $250 | Implemented |
WV0270 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,379 | $810 | Not Implemented |
WV0270 # 07 Y:2003 | 07 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,894 | $500 | Not Implemented |
WV0270 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $7,108 | $1,418 | Implemented |
WV0270 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,121 | $150 | Implemented |
WV0270 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,034 | $250 | Not Implemented |
WV0270 # 03 Y:2003 | 03 | 2003 | DEVELOP A REPAIR/REPLACE POLICY | $6,214 | $625 | Implemented |
WV0270 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,533 | $0 | Implemented |