Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 3599 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0565 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $566 | $906 | Implemented |
SU0565 # 06 Y:2024 | 06 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $180,000 | $160,000 | Not Implemented |
SU0565 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $965 | $54 | Implemented |
SU0565 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,157 | $7,850 | Implemented |
SU0565 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,877 | $0 | Implemented |
SU0565 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,849 | $329 | Implemented |
SU0565 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,336 | $0 | Implemented |
SU0565 # 02 Y:2024 | 02 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,793 | $0 | Implemented |
SU0565 # 09 Y:2024 | 09 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,298 | $6,264 | Implemented |
SU0565 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,907 | $383,075 | Not Implemented |
UC2413 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $829 | $0 | n/a |
UC2413 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $972 | $75 | n/a |
UC2413 # 03 Y:2024 | 03 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,916 | $36,122 | n/a |
UC2413 # 02 Y:2024 | 02 | 2024 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $614 | $0 | n/a |
UC2413 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,166 | $2,183 | n/a |
UC2413 # 07 Y:2024 | 07 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,645 | $32,845 | n/a |
UC2413 # 06 Y:2024 | 06 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,482 | $16,784 | n/a |
MS0435 # 04 Y:2024 | 04 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,222 | $0 | n/a |
MS0435 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $609 | $2,713 | n/a |
MS0435 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,911 | $100,000 | n/a |
MS0435 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $101,423 | $659,750 | n/a |
MS0435 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $37,679 | $1,527 | n/a |
UL2410 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,202 | $4,083 | n/a |
UL2410 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $52,875 | $349,289 | n/a |
UL2410 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,828 | $3,060 | n/a |