Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,696
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0033 # 08 Y:2025 | 08 | 2025 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $57,302 | $150,000 | n/a |
SJ0033 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $123,902 | $507,150 | n/a |
SJ0033 # 06 Y:2025 | 06 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,984 | $316 | n/a |
SJ0033 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,277 | $0 | n/a |
SJ0033 # 09 Y:2025 | 09 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,191 | $0 | n/a |
SJ0033 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,132 | $39,246 | n/a |
SJ0033 # 07 Y:2025 | 07 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $39,875 | $0 | n/a |
SJ0033 # 10 Y:2025 | 10 | 2025 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $88,611 | $0 | n/a |
SJ0033 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,035 | $0 | n/a |
SJ0033 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,071 | $384 | n/a |
IP0206 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,184 | $17,042 | n/a |
IP0206 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,530 | $714 | n/a |
IP0206 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,174 | $877 | n/a |
IP0206 # 06 Y:2024 | 06 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,970 | $4,748 | n/a |
IP0206 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,948 | $83 | n/a |
IP0206 # 04 Y:2024 | 04 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $719 | $419 | n/a |
OK1134 # 04 Y:2025 | 04 | 2025 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $257,299 | $103,000 | n/a |
OK1134 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $262 | $0 | n/a |
OK1134 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $100,152 | $858,000 | n/a |
OK1134 # 03 Y:2025 | 03 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $11,172 | $0 | n/a |
SF0630 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,310 | $2,631 | n/a |
SF0630 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,052 | $0 | n/a |
SF0630 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $235,065 | $1,065,176 | n/a |
SF0630 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,379 | $883 | n/a |
SF0630 # 02 Y:2025 | 02 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,005 | $0 | n/a |