Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,899
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0262 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $24,314 | $29,878 | Implemented |
UU0262 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,117 | $834 | Implemented |
UU0262 # 04 Y:2025 | 04 | 2025 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $13,561 | $178,488 | Implemented |
UU0262 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,129 | $12,300 | Implemented |
UU0262 # 06 Y:2025 | 06 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $720 | $1,680 | Implemented |
WV0673 # 12 Y:2024 | 12 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $179 | $80 | Implemented |
WV0673 # 11 Y:2024 | 11 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $470 | $887 | Implemented |
WV0673 # 09 Y:2024 | 09 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $560 | Implemented |
WV0673 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $6,139 | $11,569 | Implemented |
WV0673 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,359 | $6,620 | Implemented |
WV0673 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,382 | $16,575 | Implemented |
WV0673 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $4,399 | $2,317 | Implemented |
MI0451 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,582 | $40 | Implemented |
MI0451 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $529 | $949 | Implemented |
MI0451 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $2,513 | $1,755 | Implemented |
MI0451 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,862 | $16,333 | Implemented |
MI0451 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $4,130 | $4,044 | Implemented |
MI0451 # 06 Y:2024 | 06 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,231 | $100 | Implemented |
MU0056 # 04 Y:2024 | 04 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $502 | $207 | Implemented |
MU0056 # 05 Y:2024 | 05 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $120 | $187 | Implemented |
UF0619 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,007 | $0 | Implemented |
UF0619 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,458 | $9,470 | Implemented |
UF0619 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $705 | $1,252 | Implemented |
UF0619 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,482 | $6,000 | Implemented |
UF0619 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,655 | $13,445 | Implemented |