IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,899

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0262 # 03 Y:2025 03 2025 INSULATE BARE EQUIPMENT $24,314 $29,878 Implemented
UU0262 # 07 Y:2025 07 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,117 $834 Implemented
UU0262 # 04 Y:2025 04 2025 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $13,561 $178,488 Implemented
UU0262 # 08 Y:2025 08 2025 OPTIMIZE PLANT POWER FACTOR $5,129 $12,300 Implemented
UU0262 # 06 Y:2025 06 2025 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $720 $1,680 Implemented
WV0673 # 12 Y:2024 12 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $179 $80 Implemented
WV0673 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $470 $887 Implemented
WV0673 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $560 Implemented
WV0673 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $6,139 $11,569 Implemented
WV0673 # 04 Y:2024 04 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,359 $6,620 Implemented
WV0673 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,382 $16,575 Implemented
WV0673 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $4,399 $2,317 Implemented
MI0451 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $9,582 $40 Implemented
MI0451 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $529 $949 Implemented
MI0451 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $2,513 $1,755 Implemented
MI0451 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,862 $16,333 Implemented
MI0451 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $4,130 $4,044 Implemented
MI0451 # 06 Y:2024 06 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,231 $100 Implemented
MU0056 # 04 Y:2024 04 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $502 $207 Implemented
MU0056 # 05 Y:2024 05 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $120 $187 Implemented
UF0619 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,007 $0 Implemented
UF0619 # 05 Y:2024 05 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,458 $9,470 Implemented
UF0619 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $705 $1,252 Implemented
UF0619 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,482 $6,000 Implemented
UF0619 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,655 $13,445 Implemented