IAC logo
IAC Assessment: UF0619
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0619
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2024
Principal Product Circuit Boards Assembly and Test
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 52,000
Annual Production 319,000 Units
Production Hrs. Annual 4,250
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,852 1,239,226 kWh $0.10
Electricity Demand $44,608 3,722 kW-months/year $11.98
Electricity Fees $25,514 - $ -
TOTAL ENERGY COSTS $189,974
RECOMMENDED SAVINGS* $667,871 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$16,482
Cost:
$6,000
$12,021 123,923 $4,461 372 - - $12,021
123,923
kWh
$4,461
372
kW-months/year
-
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$11,318
Cost:
$25,440
$8,357 86,158 $2,961 247 - - $8,357
86,158
kWh
$2,961
247
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,655
Cost:
$13,445
$7,899 81,431 $2,756 230 - - $7,899
81,431
kWh
$2,756
230
kW-months/year
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$7,989
Cost:
$36,000
$5,105 52,631 $2,884 241 - - $5,105
52,631
kWh
$2,884
241
kW-months/year
-
-
$
05: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$3,458
Cost:
$9,470
$3,458 35,654 - - - - $3,458
35,654
kWh
-
-
kW-months/year
-
-
$
06: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$1,257
Cost:
$5,940
$1,257 12,960 - - - - $1,257
12,960
kWh
-
-
kW-months/year
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,007
Cost:
-
$1,007 10,379 - - - - $1,007
10,379
kWh
-
-
kW-months/year
-
-
$
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$705
Cost:
$1,252
$705 7,265 - - - - $705
7,265
kWh
-
-
kW-months/year
-
-
$
09: 4.446 AUTOMATE FINISHING PROCESS Savings:
$315,000
Cost:
$181,056
- - - - $315,000 - -
-
kWh
-
-
kW-months/year
$315,000
-
$
10: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$300,000
Cost:
$183,056
- - - - $300,000 - -
-
kWh
-
-
kW-months/year
$300,000
-
$
TOTAL RECOMMENDED Savings:
$667,871
Cost:
$461,659
$39,809 410,401 $13,062 1,090 $615,000 - $39,809
410,401
kWh
$13,062
1,090
kW-months/year
$615,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes