IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,791

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0141 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $716 $200 Implemented
MA0141 # 07 Y:1989 07 1989 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,906 $0 Implemented
LT0139 # 05 Y:1988 05 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $213 $208 Implemented
GT0360 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,520 $0 Implemented
GT0360 # 02 Y:1988 02 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,950 $1,800 Implemented
GT0360 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,741 $21,965 Implemented
GT0360 # 06 Y:1988 06 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $490 $500 Implemented
WI0042 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $624 $0 Implemented
WI0042 # 06 Y:1988 06 1988 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $446 $0 Implemented
WI0042 # 07 Y:1988 07 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,012 $250 Implemented
OK0268 # 02 Y:1988 02 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,034 $520 Implemented
OK0268 # 03 Y:1988 03 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,336 $0 Implemented
OK0268 # 05 Y:1988 05 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,350 $2,030 Implemented
OK0268 # 06 Y:1988 06 1988 INSULATE BARE EQUIPMENT $2,083 $1,185 Implemented
OK0268 # 07 Y:1988 07 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $320 $637 Implemented
OK0268 # 08 Y:1988 08 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,742 $275 Implemented
RU0032 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $173 $72 Implemented
RU0032 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,300 $596 Implemented
RU0032 # 04 Y:1988 04 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $236 $260 Implemented
RU0032 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $509 $347 Implemented
RU0032 # 07 Y:1988 07 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,098 $500 Implemented
LT0124 # 01 Y:1988 01 1988 COVER OPEN TANKS $64,900 $12,000 Implemented
LT0124 # 02 Y:1988 02 1988 USE OPTIMUM THICKNESS INSULATION $9,378 $2,760 Implemented
LT0124 # 03 Y:1988 03 1988 REDESIGN PROCESS $6,995 $0 Implemented
LT0124 # 04 Y:1988 04 1988 USE OPTIMUM TEMPERATURE $3,576 $0 Implemented