IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2306 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,621 $1,600 Not Implemented
UC2306 # 01 Y:2023 01 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $2,520 $0 Not Implemented
UC2306 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,636 $11,635 Implemented
UC2306 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $429 $1,916 Not Implemented
UC2306 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $70,539 $385,242 Not Implemented
UC2306 # 12 Y:2023 12 2023 USE HEAT PUMP FOR SPACE CONDITIONING $20,361 $73,450 Not Implemented
UC2306 # 03 Y:2023 03 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $375 $0 Implemented
UC2306 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $795 $600 Not Implemented
UC2306 # 09 Y:2023 09 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,865 $22,297 Not Implemented
UC2306 # 10 Y:2023 10 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $207 $733 Not Implemented
UC2306 # 08 Y:2023 08 2023 INSTALL TIMERS AND/OR THERMOSTATS $1,986 $3,066 Not Implemented
UC2306 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,153 $34,274 Implemented
UC2202 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $135,088 $543,322 Not Implemented
UC2202 # 01 Y:2022 01 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,740 $114,471 Implemented
UC2202 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,344 $200 Implemented
UC2202 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $322 $960 Not Implemented
UC2202 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,684 $2,000 Implemented
MA0824 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $10,379 $54,695 Not Implemented
MA0824 # 05 Y:2020 05 2020 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,491 $6,300 Implemented
MA0824 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,177 $29,750 Implemented
MA0824 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,118 $7,710 Implemented
MA0824 # 01 Y:2020 01 2020 REPLACE BOILER $15,999 $29,000 Not Implemented
MA0715 # 01 Y:2013 01 2013 BURN A LESS EXPENSIVE GRADE OF FUEL $4,116 $500 Not Implemented
MA0715 # 02 Y:2013 02 2013 REDUCE VENTILATION AIR $1,256 $1,795 Implemented
MA0715 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $599 $600 Implemented